Services Provided
On a technical level the following solutions were provided and successfully delivered:
- The diagnosis, identification and remediation of the source of water leaks.
- Rebuilding of the severely damaged and corroded joints -brought back to “as good as new”
- Redesign, manufacture and installation of the centre feed line cover plates, eliminating the requirement for earth bonding
Efficient Time Frame
Job was completed in approximately 8 weeks (excluding inclement weather restrictions).
Quality Control
Pool was returned to service with no evidence of water loss due to leaks.
Satisfaction
Client was extremely happy with the final outcome.
Working Relationship
An excellent and productive working relationship was formed between Toowoomba Regional Council and Concrete Seal.